|
| MIL-A-51487A(EA)
(2) Name and address of test facility and shipping instructions when testing is
performed by the Government.
(3) Time required for the Government to notify the contractor whether or not
to proceed with production.
6.3 Submission of alternate inspection provisions. Proposed alternate inspection pro-
visions should be submitted by the contractor to the procuring contracting officer for evalu-
ation and approval by the technical activity responsible for preparation of this specification.
6.4 Elimination of AQLs. This specification is certified to be in compliance with cur-
rent Army Material Command (AMC) policy for the elimination of Acceptable Quality
Levels/Lot Tolerance Percent Defective (AQLs/LTPDs) from military specifications.
6.5 Subject term (key word) listing.
Insulation resistance
Launcher, smoke grenade
Preparing activity:
Custodian:
Army - EA
Army - EA
Project No. 1040-A191
12
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |