MIL-B-38977(USAF)
6.2 Ordering Data. Procurement documents. should specify the
following:
Title, number and date of this specification.
a.
Number of spare parts kits to be furnished if required.
b.
These items may be ordered separately.
NOTE:
c.  Provisions should be made for making the Parachute Deploy-
ment Assembly (PN 66D14398) available to the Government.  The
Government parachute packing activity will then send the parachute
assembly either back to the manufacturer or on to the using agency.
d.  Whether preproduction tests will be conducted by the
procuring activity.
e.  Conditions under which Government loaned property will be
made available tc the contractor.
Levels of preservation, packaging and packing.
f.
6.2.1 Cartridge Kits. The M248 Cartridges should be procured
separately.
6.2.2 Preproduction Test Samples. It is expected that the contract
or purchase order will specify that a minimum of two units represen-
tative of the production practice bomb will be submitted to the
procuring activity for test and evaluation. The invitation for bids,
contract or purchase order should specify the point of inspection
for these tests.
6.3 Production Delivery. No production practice bomb should be
delivered prior to full approval of the preproduction samples.
6.4 Definitions
a.  Preproduction Tests. Preproduction tests are those tests
performed prior to production on representative samples of the
production equipment to demonstrate that the equipment meets the
requirements of this specification.
b. Acceptance Tests. Acceptance tests are those tests accomplished
on representative smamples of equipment submitted for acceptance under
a contract to determine conformance to the requirements of this
specification, and to determine that the equipment is equivalent in
performance and construction to the approved preproduction samples.
Preparing Activity
Custodian
Air Force - 15
Air Force - 15
11
WLIR
EAC/pfg

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business