Click here to make tpub.com your Home Page

Page Title: Table II. Classification of inspections
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-B-45390A(AT)
4.4.1 Preproduction inspection. When specified (see 6.2), the preproduction sample shall
consist of one bulldozer kit. Preproduction inspection shall consist of inspection as specified in
table II.
4.4.2 Initial production inspection. Unless otherwise specified (see 6.2), the Government
shall select one bulldozer kit, from the first ten units produced under the production contract for
initial production inspection. Initial production units shall be inspected as specified in table II.
4.4.3 First article inspection failure. Test item deficiencies during, or as a result of, the first
article test, shall be cause for rejection of the items until evidence has been provided by the
contractor that corrective action has been taken to eliminate the deficiency. Any deficiency
found during, or as a result of the first article test, shall be evidence that all items already
produced prior to completion of the first article test are similarly deficient unless contrary
evidence satisfactory to the contracting officer is furnished by the contractor. Such deficiencies
on all items shall be corrected by the contractor. The Government shall not accept products until
first article testing is completed to the satisfaction of the Government.
TABLE II. Classification of inspections.
Inspec-
First
Quality conformance
Title
Requirement
tion
article
Exami-
Tests
Con-
nation
trol
Materials and
3.2 thru
4.6.1
X
construction
3.3.2 and
3.3.4
Defect (see
3.3, 3.3.3
4.6.2
X
X
4.5.2 and
and 3.5
table III)
thru 3.7
Performance
3.4
4.6.3
X
X
Hydraulic
3.4.1
4.6.3.1
X
X
operating
system
Controls and
3.4.2
4.6.3.2
X
X
linkage
Safety relief
3.4.3
4.6.3.3
X
X
valve
Digging depth
3.4.4
4.6.3.4
X
X
Rate of lift
3.4.5
4.6.3.5
X
High temperature
3.4.6.1
4.6.3.6.1
X
Low temperature
3.4.6.2
4.6.3.6.2
X
7

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business