|
| ![]() MIL-B-63299A(AR)
4.3 First article inspection.
4.3.1 Submission. The contractor shall submit a first article
sample as designated by the Contracting Officer for evaluation in
accordance with the provisions of 4.3.2. The first article sample
shall consist of the following items in sample quantities as
indicated.
Part Description
Drawings
Quantity
Body Assembly
9292680
80
Electronic and Housing Assembly
9292679
15
Power Supply Housing Assembly
9292616
15
Shorting Bar and Connector Assembly
9292158
15
Receiver Coil Assembly
9292652
15
Battery and Lead Assembly
9292678
15
Upper Housing Assembly
9292631
15
A sample of 10 for all other components listed in Table I.
4.3.2
Inspections to be performed.
See MIL-A-48078 and Table I
herein.
4.3.3 Rejection.
See MIL-A-48078.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |