Click here to make tpub.com your Home Page

Page Title: Inspections to be performed
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-B-70448(AR)
4.3 First article inspection.
4.3.1 Submission.
The contractor shall submit a first
article as designated by the Contracting Officer for evaluation in
accordance with the provisions of 4.3.2.
The first article sample
shall consist of the following items in sample quantities as
indicated.
Part Description
Drawing
Quantity
Barrel, Machine Gun, Cal .50 Recoil
Amplifier,  Practice, M3
9370142
32
Discriminator
9370141
64
4.3.2 Inspections to be performed.
First Article assemblies
shall be subjected to all the examinations and tests specified in
Table 1, quality assurance provisions, and such other inspection
as necessary to determine compliance with contract requirements.
I
4.3.3  Rejection.
If any assembly fails to comply with any of
the applicable requirements, the First Article Sample shall be
rejected.
The government reserves the right to terminate its
inspection upon any failure of an assembly in the sample to comply
with any of the stated requirements.
I

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business