Click here to make tpub.com your Home Page

Page Title: Inspections to be performed
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-B-70511B (AR)
4.2.1.1 Sample.  The contractor shall submit a first article
sample as designated by the Contracting Officer for evaluation in
accordance with provisions of 4.2.1.2. The first article sample
shall consist of-the assemblies, components and test specimens
listed below in the quantities indicated:
Quantity
Drawings
Part Description
10
11833491
Bolt, Automatic weapon:
(Practice) M2
4.2.1.2 Inspections to be performed.  As determined by the
Government, the first article assemblies, components and test
specimens may be subjected to any or all of the examinations and
tests specified in this detail specification and be inspected for
compliance with any or all requirements of the applicable
drawings.
4.2.1.3  Rejection.  If any assembly, component or test
specimen fails to comply with any of the applicable requirements,
the first article sample shall be rejected. The Government
reserves the right to terminate inspection upon failure of any
assembly, component or test specimen to comply with any of the
requirements.
7

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business