|
| MIL-B-70677 (AR)
4.3.1 Submission. The contractor shall submit a first article
sample as designated by the Contracting Officer for evaluation in
accordance with the provisions of 4.3.2. The first article sample
shall consist of the items as required per Table I. Total
quantities are as follows:
Part Description
Drawings
Quantity
Tube, Burster
9391038
20
Burster, Projectile XM85
9391037
20
4.3.2 Inspections to be performed.
See MIL-A-48078 and Table I
specified herein.
4.3.3 Rejection.
See MIL-A-48078
4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |