Click here to make tpub.com your Home Page

Page Title: Requirements
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-21679(NOrd)
DRAWINGS
BUREAU OF ORDNANCE
CD-10 Mod 1 Mechanism.
LD 166774
Container, Inner, for Clock
LD 284699
Delay Mechanisms.
Container, Outer, for Clock
LD 284862
Delay Mechanisms.
Marking Instructions for Storage
1476194
and Shipping Containers.
And all documents listed in the above LD's and drawings.
PUBLICATIONS
BUREAU OF ORDNANCE
NAVORD OP 400
General Instructions for Design,
Manufacture and Inspection of
Naval Ordnance Equipment.
(Copies of specifications, standards, drawings and pub-
lications required by contractors in connection with specific
procurement functions should be obtained from the procuring
activity or as directed by the contracting officer.)
REQUIREMENTS
3.
3.1
General requirements.
3.1.1  The clock delay,
Mod 1 Mechanism, shall be
manufactured in accordance with LD 166774 and all documents
listed thereon.
3.1.2  The requirements and procedures established in
OP 400 shall be complied with as applicable.
3.1.3  Preproduction sample. - Unless otherwise speci-
fied in the contract or order, a preproduction sample shall
be manufactured by the same procedures and processes and at
the same location as proposed for full production. This
sample will be tested for the purpose of determining com-
pliance with the requirements of this specification, the
drawings, and the contract.  See 4.1.2.
2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business