Click here to make tpub.com your Home Page

Page Title: First article
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-24196A(SH)
6.2.2.1 The data requirements of 6.2.2 and any task in sections 3, 4, or
5 of this specification required to be performed to meet a data requirement
may be waived by the contracting/acquisition activity upon certification by
the offeror that identical data were submitted by the offeror and accepted by
the Government under a previous contract for identical item acquired to this
specification.  This does not apply to specific data which may be required for
each contract regardless of whether an identical item has been supplied
previously (for example, test reports).
6.3 First article,  When a first article inspection is required, the item
should be a first article sample.  The first article should consist of one unit.
The contracting officer should include specific instructions in acquisition docu-
ments regarding arrangements for examinations, approval of first article test
results and disposition of first articles.  Invitations for bids should provide
that the Government reserves the right to waive the requirement for first article
inspection to those bidders offering a product which has been previously acquired
or tested by the Government, and that bidders offering such products, who wish
to rely on such production or test, must furnish evidence with the bid that
prior Government approval is presently appropriate for the pending contract.
6.4 Provisioning.  Provisioning Technical Documentation (PTD), spare
parts, and repair parts should be furnished as specified in the contract.
6.4.1 When ordering spare parts or repair parts for the equipment covered
by this specification, the contract should state that such spare parts and
repair parts should meet the same requirements and quality assurance provisions
as the parts used in the manufacture of the equipment.  Packaging for such
parts should also be specified.
6.5 Sub-contracted material and parts.  The preparation for delivery or
packaging requirements of referenced documents listed in section 2 do not apply
when material and parts are acquired by the contractor for incorporation into the
equipment and lose their separate identity when the equipment is shipped.
6.6 Technical manuals.  The requirement for technical manuals should be
considered when this specification is cited on a contract.  If technical manuals
are required, a contract exhibit must be prepared to fully describe statement of
work criteria and delivery instructions, and cite the applicable technical manual
specification.  The technical manuals must be acquired by separate Contract Line
Item Number (CLIN) in the contract.
6.7 Subject term (key word) listing.
Electrostatic precipitator cells
Magnetostrictive
Nickel laminate
Thermocouple
Transducers
Generator
18

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business