Click here to make tpub.com your Home Page

Page Title: Rain test
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
a. All equipment shall be set up for operation in an arrangement as
indicated on Drawing 6-1-9558 with an industrial analyzer properly
installed in the cable leaving the Government loaned generator.
c.
All starting switches shall be in the "OFF" position
d. Sewing machine needles and bobbins shall be removed from the darner,
button, and clothing machines.
f.
After the generator has warmed up, the generator eaker shall be
br
placed in the "ON" position.
j. Record the voltage and current for each power line.
15

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business