| a. All equipment shall be set up for operation in an arrangement as
indicated on Drawing 6-1-9558 with an industrial analyzer properly
installed in the cable leaving the Government loaned generator.
c.
All starting switches shall be in the "OFF" position
d. Sewing machine needles and bobbins shall be removed from the darner,
button, and clothing machines.
f.
After the generator has warmed up, the generator eaker shall be
br
placed in the "ON" position.
j. Record the voltage and current for each power line.