40.4 Failure analysis. The contractor shall conduct a failure analysis by
performing a dimensional, physical and visual examination of the components which
are suspected to have caused the failure. Results shall be submitted to the
Government for a failure cause determination. If it is determined that failure
occurred because of deviation from specified dimensions or physical properties or
both, the contractor shall accomplish, as applicable, the following actions:
a. Evaluate and correct the applicable production processes and procedures to
prevent recurrence of the same defect in future production.
b.
Examine completely assembled cannon and partially assembled cannon and
components to ensure that material containing the same defect is purged
from the inventory and not presented to the Government for acceptance.
c. Submit the results of the failure analysis and the corrective actions
taken to the Government for evaluation and approval of retest or
continuation of test.