| MIL-C-45978A (AR)
required, the specific issue of individual documents
referenced (see 2.1.1) .
c.
Requirements for and the number of cannon, components
thereof, or both to be submitted for first article, first
article initial production test (FA-IPT) or RAM-D tests
by the contractor (see 3.2, 3.2.1 or 3.4).
..
d.
The examinations and tests to be performed by the
contractor and the examinations and tests to be performed
by the Government.
e.
All inspection and test data that is required.
f.
At whose expense a retest may be performed.
Any additional or extended examinations and tests beyond
9"
the scope of this specification.
Serial numbers for the cannon and repair tube assemblies.
h.
i.
Inspection equipment, responsibility for acquisition,
maintenance, and disposition thereof, if other than as
specified (see 4.7.3.1).
Availability of inspection equipment from the Government.
k.
Extent of contractor's responsibility for Government
furnished and for contractor required final inspection
equipment.
Applicable acceptance test procedures.
1.
When a proof firing sampling plan is authorized, the
m.
proof firing sampling plan parameters: initial
consecutive quantity (i), sampling frequency (f) and an
AQL of 1.0 (see 4.7.6a).
n.
Under what conditions simulated firing may be performed,
the test equipment available, and the procedures to be
followed.
o.
The levels of preservation, packaging, and packing
required for cannon assemblies (see 5.1) and repair parts
(see 5.2).
Marking and bar code marking requirements (see 5.3).
When warranted, the application of MIL-Q-9858 or
MIL-I-45208, as appropriate.
14
|