|
| MIL-C-48458B(AR)
4.5.4.2 Acceptance. Where any one assembly fails to meet any specified
requirement, the defective assembly shall be removed from the lot and
resubmitted only after all defects have been corrected.
4.5.5 Inspection equipment. Unless otherwise specified in the contract,
the contractor shall supply, maintain and calibrate inspection equipment in
accordance with the provisions of MIL-I-45607 and MIL-STD-45662.
4.5.6 Packaging inspection. The sampling and inspection of the
preservation - packaging, packing and container marking shall be in accordance
with the provisions of packaging data sheet P11732392.
TABLE VIII. Test equipment.
4.6.2 Performance test.
4.6.2.1 Pin-to-pin resistance. Use items 1, 2 and 5 of able VIII or
suitable equipment to verify the requirements of 3.3.1.
4.6.2.2 Amno select switching logic. Use items 1, 2 and 5 of table VIII
or suitable equipment to verify the requirements of 3.3.2.
4.6.2.3 GCU common zero and zeroing signals switching logic. Use items
1, 2 and 5 of table VIII or suitable equipment to verify the requirements of
3.3.3.
13
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |