Click here to make tpub.com your Home Page

Page Title: Figure 3: Delete in its entirety and substitute
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-48610B(AR)
AMENDMENT 1
PAGE 11
Figure 3: Delete in its entirety and substitute:
FIGURE 3. Sync signal A and B.
PAGE 16
4.6.1: Delete in its entirety and substitute:
"4.6.1 Test equipment. The test equipment in table VIII may
be used wherer specified to perform the required test. If
alternate test equipment is to be used, the contractor shall
submit inspection equipments designs for review and approval in
accordance with the terms of the contract (see 6.4)."
3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business