Click here to make tpub.com your Home Page

Page Title: Submission of test data.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-50509A(AR)
6.3  Submission of inspection equipment designs for approval.
Submit equipment designs as required to
See MIL-A-48078.
Commander, US Army Research, Development and Engineering Center,
ATTN : AMSMC-QAF-I (D) , Picatinny Arsenal, New Jersey 07806-5000.
This address will be specified in the Contract Data Requirements
List (DD Form 1423) in the contract.
6.4 Submission  of  results  of  contractor-conducted
examinations and tests.  Data shall be submitted in accordance with
data item DI-R-1721 on the DD Form 1423 for the contract.
6.5  Submission of test data.
In addition to the normal
distribution of records, when the cartridge is procured by the US
Army distribution of records, when the cartridge is procured by
the US Army Armament Command, on (1) copy of all ballistic data
and ammunition data cards shall be forwarded to:
Commander, US
Army Research, Development and Engineering Center, ATTN:
AMSMC-QAF-S (D) , Picatinny Arsenal, New Jersey 07806-5000.
The cartridges will be
6.6 Transportation
Vibration.
considered safe to transport providing no evidence exists of loose
powder or composition in the box.
6.7 Transportation
Vibration.
The cartridges will be
considered free of damage that will affect the intended function
provided the top seal has not been broken by movement or
displacement of the top or the case side has not been distorted
sufficiently to prevent ejection of the illuminant assembly.
6.8 Proving ground test.
Initial production testing shall be
conducted in accordance with US Army Test and Evaluation Command
Initial Production Test Plan No. CART-40GL-VAR.
6.9 Metal  defective.
Nick, crack, dent or sharp edge which
might interfere with the proper assembly or end item performance
of the item.
6.10 Proving Ground Test Summary:
TEST
SAMPLE SIZE
REQUIREMENTS
Functioning
First Article
(1)
Hot
80
See 3.4.4 & 4.3.3.1
Ambient
280
See 3.4.5 & 4.3.3.1
c.
Cold
80
See 3.4.6 & 4.3.3.1
34

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business