Click here to make tpub.com your Home Page

Page Title: Submission of results of contractor
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-50527 (MU)
6.4 Submission of results of contractor-conducted
examinations and tests.-Unless otherwise specified by the
Contracting Officer, the contractor shall forward requested
records of examinations or tests to Commanding Officer, Picatinny
Arsenal, ATTN:  SMUPA-ND3.
6.5 If the requirements cannot be met in the free state,
the "go" inside diameter plug gage may be Inserted in the cartridge
case while inspecting the "go" and "no go" second largest outside
diameter.  If the "go" inside diameter plug gage is utilized, the
data cards shall be annotated accordingly.
6.6 If the requirement cannot be met in the free state, a
restricted confining fixture may be utilized while inspecting
the "go" and "no go  largest inside diameter. If the restricted
fixture is utilized, the data cards shall be annotated accordingly.
6.7  Metal defective.-Nick, crack, dent or sharp edge which
might interfere with the proper assembly or end item performance
of the Item.
Preparing Activity:
Custodian:
Army-MU.
Army-MU
1310-A-119
Project Number:
14

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business