|
| MIL-C-50527 (MU)
6.4 Submission of results of contractor-conducted
examinations and tests.-Unless otherwise specified by the
Contracting Officer, the contractor shall forward requested
records of examinations or tests to Commanding Officer, Picatinny
Arsenal, ATTN: SMUPA-ND3.
6.5 If the requirements cannot be met in the free state,
the "go" inside diameter plug gage may be Inserted in the cartridge
case while inspecting the "go" and "no go" second largest outside
diameter. If the "go" inside diameter plug gage is utilized, the
data cards shall be annotated accordingly.
6.6 If the requirement cannot be met in the free state, a
restricted confining fixture may be utilized while inspecting
the "go" and "no go largest inside diameter. If the restricted
fixture is utilized, the data cards shall be annotated accordingly.
6.7 Metal defective.-Nick, crack, dent or sharp edge which
might interfere with the proper assembly or end item performance
of the Item.
Preparing Activity:
Custodian:
Army-MU.
Army-MU
1310-A-119
Project Number:
14
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |