|
| MIL-C-50740(MU)
8 August ]973
4.
QUALITY
ASSURANCE
PROVISIONS
4.1 Responsibility for inspection. Unless otherwise specified in
the conteract or purchase order, the supplier is responsible for the per-
formance of all inspection requirements as specified herein. Except as
otherwise specified, the supplier may utilize his own or any other facilities
suitable for the performance of the inspection requirements specified
herein, unless disapproved by the Government. The government reserves
the right to perform any of the inspections set forth in the specification
where such inspections are deemed necessary to assure supplies and
services conform to prescribed requirements.
4.11 General provisions. The component and subassembly
inspection requirements of MIL-F-13926 form a part of the quality
assurance provisions of this specification. Definitions of inspection
terms shall be as listed in MIL-STD-109.
4.2 First article (initial production) approval. The requirement
for first article approval and the responsibility (Government or con-
tractor) for first article testing shall be as specified in the contract.
The sample for first article approval tests shall consist of three assem-
blies. The sample shall be manufactured in the same manner, using
the same materials, equipment, processes, and procedures as used in
regular production. All parts and materials, including packaging and
packing, shall be obtained from the same source of supply as used in
regular production.
4.2.1 Government testing. When the Government is responsible
for cc)nducting first article approval tests, the contractor, prior to sub-
mitting the sample to the Government, shall inspect the sample to insure
conformance to all the requirements of this specification. A record
of this insepction, including certificates of conformance for materials,
shall be submitted with the sample.
4.2.2 Contractor testing. When the contractor is responsible
for conducting the first article approval tests, the sample shall be
inspected by the contractor for all the requirements of this specification.
The sample and a record of this inspection, including certificates of
conformance for materials, shall be submitted to the Government for
approval. The Government reserves the right to witness the contractor's
inspection.
4.3 Inspection provisions
4.3.1 Submission of product. Unless otherwise specified herein,
or by the contracting o fficer, inspection lot size, lot formation and pre-
sentation of lots shall be in accordance with inspection or sampling pro-
cedures herein and submission of product provisions of MIL-STD-105.
7
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |