|
| MIL-C-53057(ME)
TABLE III. Test schedule. (Continued)
Test
Requirement
Test
Paragraph
paragraph
1
2
3
4
5
6
7
X
-
-
-
Pump inlet pressure.
4.6.2.17.1
3.12.1.4
X
X
X
X
Hydraulic system roll-off
4.6.2.17.3
3.12.8
cleanliness.
X
X
-
-
Hydraulic cylinders.
4.6.2.17.4
3.12.7
X
-
-
-
Pump contaminant tolerance.
4.6.2.17.5
3.12.2
X
X
-
-
Hydraulic fittings
4.6.2.17.6
3.12.1.1
X
-
-
-
Hydraulic control valves.
4.6.2.17.7
3.12.6
X
X
-
-
Electromagnetic interference.
4.6.2.19
3.28
X
X
-
-
Slinging provisions.
4.6.2.20
3.31, 3.1.3.1
X
X
-
-
Tiedown provisions.
4.6.2.21
3.31, 3.1.3.1
-
-
-
-
Noise level measurement.
4.6.2.22
X
X
-
-
Operator's station.
4.6.22.1
3.6.1.1
X
X
-
-
Exterior noise.
4.6.2.22.2
3.6.1.2, 3.25
X
X
-
-
Rain.
4.6.2.23
3.10.2.8, 3.4.4
X
X
-
-
Wheel guards.
4.6.2.24
3.16
X
X
-
-
4.6.2.25
3.4.2, 3.4.3,
Low temperature (-25 F)
3.10, 3.10.2.1,
3.10.2.6, 3.12
X
X
-
-
4.6.2.26
3.9, 3.9.4,
Wet brakes and fording.
3.10.2.9, 3.23,
Service brake.
3.18.1
X
X
-
-
4.6.2.27
3.9.12
High speed.
X
X
-
-
4.6.2.28
3.23.12, 3.23.13
Controls.
X
X
-
-
4.6.2.29
3.9.11, 3.10.2.6,
Endurance.
3.10, 3.11, 3.12,
3.11.1, 3.11.1.1
X
X
-
-
4.6.2.29
3.8, 3.10,
Reliability.
3.10.2.4,
3.10.2.6, 3.11,
3.11.1.1, 3.12
X
X
-
-
4.6.2.30
3.7
Maintainability.
X
X
-
X
4.6.2.31
Section 3
Run-in.
X
X
-
-
4.6.2.32
3.11.2
Rear axle oscillation.
X
-
X
-
4.6.2.33
Section 3
Post-test.
50
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |