| MIL-C-62204B(AR)
AMENDMENT 2
PAGE 23
*
Delete
paragraph
4.6.1
in
its
entirety
and
substitute:
"4.6.1 Test equipment. The test equipment in table VIII may
be used where specified to perform the required test. If alternate
test equipment is to be used, the contractor shall submit
inspection equipment designs for review and approval in accordance
with the terms of the contract (see 6.4)."
PAGE 27
*
Add
new
paragraph
6.4
as
follows:
"6.4 Submission of contractor inspection equipment desiqns
for approval. Submit copies of designs as required to:
Commander, U.S. Army ARDEC, ATTN: SMCAR-QAF-I, Picatinny
Arsenal, NJ 07806-5000. This address will be specified on the
Contract Data Requirements List, DD Form 1423 in the contract."
The margins of this amendment are marked with an asterisk or
vertical lines to indicate where changes (additions, modifications,
corrections, deletions) from the previous amendment were made.
This was done as a convenience only, and the Government assumes no
liability whatsoever for any inaccuracies in these notations.
Bidders and contractors are cautioned to evaluate the requirements
of this document based on the entire content irrespective of the
marginal notations and relationship to the last previous amendment.
Custodian:
Preparing Activity:
Army - AR
Army - AR
(Project
1240-A973)
2
|