|
| ![]() MIL-C-62205B(AR)
4.5.4.2 Acceptance. Where any one assembly fails to meet any specified
reurement, the defective assembly shall be removed from the lot and
resubmitted only after all defects have been corrected.
4.5.5 Inspection equipment. Unless otherwise specified in the contract,
the contractor shall supply, maintain and calibrate inspection equipment in
accordance with the provision of MIL-I-45607 and MIL-STD-45662.
4.5.6 Pa ckaging inspection. The sampling and inspection of the
preservation - packaging~ packing and container marking shall be in accordance
with the provisions of packaging data sheet P11743417.
4.6 Methods of inspection.
4.6.1 Test equipment. Unless the assembly is procured apart from the
next higher assembly? the test equipment in table V shall be used where
specified to perfom the required test.
TABLE V. Test equipment.
17
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |