3.3.6, Figure 5, OUTPUT
AT
PIN
P1-6:
Delete
"4.2
1.0
V"
and
substitute "4.0 1.5 V".
PAGE 17
4.6.1:
Delete
in
its
entirety
and
substitute
the
following:
"4.6.1 Test equipment. The test equipment in table V may be
used where specified to perform the required test. If alternate
test equipment is to be used, the Contractor shall submit
inspection equipment designs for review and approval in accordance
with the terms of the contract (see 6.4) ."
PAGE 22
Add
new
paragraph
6.4
as
follows:
"6.4 Submission of contractor inspection equipment designs
for approval. Submit comies of designs as required to: Commander,
U.S. Army ARDEC, ATTN: SMCAR-QAF-I, Picatinny Arsenal, NJ 07806-
5000. Thjs address will be specified o nthe Contract Data
Requirements list, DD Form 1423 in the contract."