|
| ![]() MIL-C-62207B(AR)
4.5.3.2 Acceptance. Acceptance and rejection shall be in accordance with
MIL-STD-105.
4.5.4 Inspection plan C.
4.5.4.1 Sample and tests. Each assembly in every lot shall be subjected
to all the tests in table III and shall be examined visually for completeness,
improper assembly and evidence of poor workmanship.
4.5.4.2 Acceptance. Where any one assembly fails to meet any specified
requirement, the defective assembly shall be removed from the lot and
resubmitted only after all defects have been corrected.
4.5.5 Inspection equipment. Unless otherwise specified in the contract,
the contractor shall supply, maintain and calibrate inspection equipment in
accordance with the provisions of MIL-I-45607 and MIL-STD-45662
4.5.6 Packaging inspection. The sampling and inspection of the
preservation - packaging, packing and container marking shall be in accordance
with the provisions of packaging data sheet P11743667.
4.6 Methods of inspection.
4.6.1 Test equipment. Unless the assembly is procured apart from the
next higher assembly, the test equipment in table VI shall be used where
specified to perform the required test.
TABLE VI. Test equipment.
11
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |