| MIL-C-63550E(AR)
4.2.3.2.2 High temperature. The assembly shall be subjected to high tem-
perature in accordance with MIL-STD-810, method 501.1, procedure I, to verify
conformance to 3.2.3.2. The temperature shall be maintained at +71C for 48
hours. At the conclusion of this time, the assembly shall be stabilized at
+52C and subjected to the performance tests of 4.2.1. Then the assembly
shall be returned to +23 10C and again subjected to the performance tests
of 4.2.1.
4.2.3.3 Storage temperature. The assembly shall be tested in conjunction
with the tests of 4.2.3.2.1 and 4.2.3.2.2 to verify conformance to 3.2.3.3.
4.3 Design and construction.
4.3.1 Production drawings. Visual examination shall be performed during
fabrication and assembly to verify conformance to the drawing set and 3.3.1.
4.3.2 Standards of manufacture. A visual examination shall be performed at
all phases of manufacture to verify continued conformance to the standards of
manufacture specified in 3.3.2.
4.3.3 Cable markings.
Each cable assembly shall be inspected to verify
compliance to 3.3.3.
4.3.4 Verification of age control. Visual examination shall be conducted
to verify conformance to 3.3.4. The contractor shall provide certification of
traceability attesting to the designated cure dates.
4.3.5 Workmanship. Workmanship examination shall be performed at all
phases of fabrication, assembly, and test and shall be in accordance with
MIL-STD-454, requirement 9, to verify conformance to 3.3.5.
4.4 Preparation for delivery. The assembly shall be inspected by the con-
tractor prior to shipment to ensure conformance to the preservation, packaging,
packing, and marking requirements in section 5. Sampling inspections shall be
limited to those characteristics that can be determined by visual examination.
5.
PACKAGING
5.1 Preservation and packing. Packaging levels and methods shall be such
as to ensure protection of the assembly against natural and induced environ-
ments. Packaging levels (A, B, and C) are defined in MIL-STD-794 and packag-
ing methods are defined in MIL-P-116.
5.1.1 Level A. For level A (long-term storage), the assembly shall be pre-
served and packed in accordance with MIL-P-116, methods II, IA, or IC, and
with the applicable packaging data sheet (AMC Form 1029) provided by the pro-
curing activity. Container shall be in compliance with MIL-STD-794 and shall
provide adequate protection against corrosion, deterioration, and damage
during handling, shipment, and storage.