The contractor shall be-subjected to
4.3.4 Requalification.
another first article for the component or assembly affected as
stipulated in the contract," if any of the following occur:
Manufacturing techniques or process controls which affect the
a.
form, fit, or function of the assembly are revised by either the
contractor or one of his subcontractors supplying parts or assemblies
or materials.
b.
The contractor relocates his production facilities or portions
thereof.
The contractor desires to use a new subcontractor
(unqualified) for materials, parts or assemblies.
d. A change occurs in the design, material, performance or
assembly of the Remote Control Unit.
e.
A lapse in production for a period of 90 days or as stipulated
in the contract.
Quality conformance inspection.
4.4
Inspection lots shall comply
4.4.1 Inspection
lot formation.
with the lot formation provisions of MIL-A-48078. In addition,
inspection lots of electronic assemblies and sub-assemblies shall
contain:
Crystals, quartz bearing the same lot interfix number from one
a.
manufacturer.
b.
Oscillators, crystal bearing the same lot interfix number from
one manufacturer.
c . Microcircuits, digital, 4096 bit (512x8) UV erasable PROM
bearing the same lot interfix number from one manufacturer.
d.
Microcircuits, digital, CMOS, 8 bit microprocessor bearing the
same lot interfix number from one manufacturer.
Microcircuits, digital, CMOS, decoder logic array bearing the
e.
same lot interfix number from one manufacturer.