| MIL-C-64030(AR)
and rotate the SAFE/ARM switch clockwise to the ARM position.
Verify that the BATT OK, CKT OK and DATA IN lights turn off. At
285 2 seconds after placing the SAFE/ARM switch in the ARM
position, transmit an RF DEPLOY command at the Maximum Field
Strength via the RF link as specified on Drawing 9333026, to the
Control Indicator. After 7 seconds, use a multimeter to verify
that the voltage at Q23 anode (VHV) is less than 0.5 volt.
4.5.2.3.15 RF deploy with incorrect group ID. At 315 2
seconds after placing the SAFE/ARM switch in the ARM position,
transmit an RF-DEPLOY command at the Maximum Field Strength via
the RF link as specified on Drawing 9333026 to the Control
Indicator, with a group ID which does not match the one coded in
the FSD pattern previously loaded into the Control Indicator.
After 7 seconds, use a multimeter to verify that the voltage at
Q23 anode (VHV) is less than 0.5 volt.
4.5.2.3.16 RF deploy test. Via the RF link to the Control
Indicator, transmit an RF DEPLOY command with the same group ID as
the one coded in the FSD pattern previously loaded into-the-
Control Indicator. After 10 seconds, use a multimeter to verify
that the voltage at Q23 anode (VHV) meets the requirements of
3.5.3.6.
101
|