|
| ![]() MIL-C-64037 (AR)
6.5 Clean scrap. Clean scrap is defined as scrap formed
in kettles, pails, risers and loading machines used in the
pouring and cooling operations, and scrap formed during the
drilling operation. Scrap from floor sweepings, ventilation,
and such apparatus (other than that of drilling operations)
is not defined as being clean scrap and shall not be used.
6.6 Loading of high explosive. Solid explosive shall not
be added to the melted explosive or to the projectile body
during pouring or cooling.
6.7 Data requirements. Deliverable data required by this
specification is cited in the following paragraph:
Applicable DID
Data Requirement
Paragraph
DI-S-3628
Nondestructive
4.5.3.3.3
Inspection Plan
(Copies of DID's required by contractors in connection with
specific acquisition functions should be obtained from the
Naval Publications and Forms Center or as directed by the
contracting officer.)
Preparing Activity:
Custodian:
Army-AR
Army-AR
(Project 1310-A293)
23
24
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |