|
| ![]() MIL-C-70725A (AR)
4.4 First article inspection.
The contractor shall submit a first
4.4.1 Submission.
article sample as designated by the Contracting Officer for
The first
evaluation in accordance with provisions of 4.4.2.
article sample shall consist of the assemblies, components and
test specimens listed below in the quantities indicated.
Quantity
Drawing
Name
30,000
Cartridge, 5.56mm, M862 12598589
Short Range Training
Ammunition
4.4.2 Inspections to be performed. As deterimed by the
Government, the first article assemblies, components and test
specimens may be subjected to any or all of the examinations and
tests specified in this detail specification and be inspected for
compliance with any or all requirements of the applicable.
drawings.
If any assembly, component or test
4.4.3 Rejection.
specimen fails to comply with any of the applicable requirements,
the first article sample shall be rejected. The Government
reserves the right to terminate inspection upon any failure of an
assembly, component or test specimen to comply with any of the
requirements.
18
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |