Click here to make tpub.com your Home Page

Page Title: Acquisition requirements.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-70725A (AR)
ammunition which precludes the normal function of the ammunition
is cause for rejection.  The package (container) shall not spill
its contents, must be capable of being handled, stacked, stored
and must not compromise ammunition protection.  However, minor
damage to the exterior container:  loose nails, split wood, bent
box hardware, dents in fiber/metal container, etc. are per-
missible and are not cause for container rejection.
5.2.3.3.2  Excplosive elements.  At the conclusion of test
12, no explosive element shall have burned or detonated and
ammunition shall be safe to dispose of by applicable handling and
disposal regulations without injury to personnel.
Packaging shall be the same as for level B.
5.3 Level C.
5.4 Marking.  The boxes shall be marked per MIL-STD-129 and
Code of Federal Regulations Title 49, Section 173.101 and United
Nations - Transport of Dangerous Goods, Section 9.
5.5 Unitization.  All ammunition must be unitized for
shipment and storage.  Packaging drawings shall be submitted to
ARDEC for transmittal to the U.S. Army Defense Ammunition Center
and School which will provide approved unitization drawings and
procedures.
NOTES
6.
(This section contains information of a general or explanatoy
nature that may be helpful, but is not mandatory.)
6.1 Intended use.  This cartridge is intended for use in
M16 series rifles for training.
Acquisition documents must
6.2 Acquisition requirments.
specify the following:
Title, number and date of this specification.
a.
b.  Issue of DODISS to be cited in the solicitation,
and, if required, the specific issue of individual documents
referenced (see 2.1.1).
Requirements for submission of first article
c.
sample.
Type and level of packing.
d.
Provision for submission of Inspection Equipment
e.
Designs.
46

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business