Click here to make tpub.com your Home Page

Page Title: Explosive sensitivity.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-70726A (AR)
3.6.3  Explosive sensitivity.  The contractor shall provide
explosive sensitivity data on all energetic material contained in
the cartridges.  The sensitivity for the materials shall be as
indicated below:
Requirement
Sensitivity
a. Impact, ERL Type 12 tools
20 cm (min)
2.4 kg, cm @ 50% point
b. Friction Pendulum
Burn - no detonation
Steel Shoe
Burn - no detonation
Fiber Shoe
No detonation in 20 tests
c. Electrostatic Discharge
.030 Joule
d. Differential Thermal Analysis 200 C (min)
3.7 Workmanship.  All plastic parts shall be fabricated in
a thorough workmanlike manner.  Plastic parts shall be free of
porosity, twist, warpage, heat marks, sinks, voids, cracks,
chipped edges, burrs, bubbles, blisters, burn marks, or other
defects that will affect serviceability.  All metal parts shall
be fabricated in a thorough workmanlike manner.  Metal parts
shall be free of burrs, chips, chipped edges, gouges, cracks,
splits , surface defects, dust, dirt, grease, oil, lacquer smears,
and other foreign matter.  The cleaning methods used shall not be
injurious to any part, nor shall the parts be contaminated by any
cleaning agent.  All assemblies shall be assembled in a thorough
workmanlike manner.  Extreme care should be exercised to avoid
contamination of primers or propellant by oil, grease, or other
foreign matter.
4. QUALITY ASSURANCE PROVISIONS
4.1  Responsibility for inspection.  Unless otherwise
specified in the contract or purchase order, the contractor is
responsible for the performance  of all inspection requirements
(examinations and tests) as specified herein. Except as
otherwise specified in the contract or purchase order, the
contractor may use his own or any other facilities suitable for
the performance of the inspection requirements specified herein,
unless disapproved by the Government.  The Government reserves
the right to perform any of the inspections set forth in the
specification where such inspections are deemed necessary to
ensure supplies and services conform to prescribed requirements.
4.1.1 Responsibility for compliance.  All items shall meet
all requirements of sections 3 and 5.  The inspections set forth
in this specification shall become a part of the contractor's
9

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business