Click here to make tpub.com your Home Page

Page Title: Submission of inspection equipment designs for approval
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-70784 (AR)
6.4  Combining  tests.
In  order  to  minimize  testing  costs,
tests  may  be  performed  concurrently  on  the  sample  cartridges
provided  that  the  tests  results  are  not affected  by  this  procedure
6.5  Submission  of  inspection  equipment  designs  for  approval.
Submit  equipment designs  as  required  to  Commander  ARDEC  ATTN:
This  address
AMSMS-QAF-  (D)  ,  Picatinny  Arsenal,  NJ  07806-5000.
will  be  specified on  the  Contract  Data  Requirements  Lists,  DD  Form
1423  in  the  contract.
unless  otherwise  specified,  data  item
DI-R-1714  will  apply.
6.6  Submission  of  results  of  contractor  conducted
Unless  otherwise  specified  by  the
examinations  and  tests.
officer,  the  contractor  should  forward  requested
contracting
records  of  examinations  or  tests  to  Commander,  ARDEC  ATTN:
AMSMC-QAF-S  (D),  Picatinny Arsenal,  NJ  07806-5000.
This  address
will  be  specified  on the  contract  Data  Requirements  Lists,  DD  Form
Unless  otherwise  specified,  data  item
1423  in  the  contract.
DI-R-1724  will  apply.
A  process  deviation  is  defined  as
a
6.7
Process  deviation.
change  in  the  approved  basic  method  of  manufacture,  or  an
operational  change  which  alters  the  metallurgical  or  physical
properties of the item.
6.8
Drawings.
Drawings  listed  in  Section  2  of  this
specification  under  the  heading  US  Army  Armament  Research
Development  and  Engineering  Center  (ARDEC)  may  also  include
drawings  prepared  by, and  identified  as,  Edgewood  Arsenal,
Frankford  Arsenal,  Rock  Island  Arsenal,  Picatinny  Arsenal,  US  Army
Armament  Research  and  Development  Command  (ARRADCOM)  or  US  Army
Armament Research  and  Development  Center  (ARDC)  drawings.
Technical  data  originally  prepared  by  these  activities  is  now
under  the  cognizance  of  ARDEC.
(key word)
listing.
6.11
Subject
term
cartridge,  25mm,
Armor
Piercing
Discarding
Sabot
Reference
waterproofness
Small  Arms  Ammunition
Preparing
activity
Custodian:
Army -AR
Army-AR
(Project 1305 -AC94)
17

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business