|
| MIL-C-70784 (AR)
6.4 Combining tests.
In order to minimize testing costs,
tests may be performed concurrently on the sample cartridges
provided that the tests results are not affected by this procedure
6.5 Submission of inspection equipment designs for approval.
Submit equipment designs as required to Commander ARDEC ATTN:
This address
AMSMS-QAF- (D) , Picatinny Arsenal, NJ 07806-5000.
will be specified on the Contract Data Requirements Lists, DD Form
1423 in the contract.
unless otherwise specified, data item
DI-R-1714 will apply.
6.6 Submission of results of contractor conducted
Unless otherwise specified by the
examinations and tests.
officer, the contractor should forward requested
contracting
records of examinations or tests to Commander, ARDEC ATTN:
AMSMC-QAF-S (D), Picatinny Arsenal, NJ 07806-5000.
This address
will be specified on the contract Data Requirements Lists, DD Form
Unless otherwise specified, data item
1423 in the contract.
DI-R-1724 will apply.
A process deviation is defined as
a
6.7
Process deviation.
change in the approved basic method of manufacture, or an
operational change which alters the metallurgical or physical
properties of the item.
6.8
Drawings.
Drawings listed in Section 2 of this
specification under the heading US Army Armament Research
Development and Engineering Center (ARDEC) may also include
drawings prepared by, and identified as, Edgewood Arsenal,
Frankford Arsenal, Rock Island Arsenal, Picatinny Arsenal, US Army
Armament Research and Development Command (ARRADCOM) or US Army
Armament Research and Development Center (ARDC) drawings.
Technical data originally prepared by these activities is now
under the cognizance of ARDEC.
(key word)
listing.
6.11
Subject
term
cartridge, 25mm,
Armor
Piercing
Discarding
Sabot
Reference
waterproofness
Small Arms Ammunition
Preparing
activity
Custodian:
Army -AR
Army-AR
(Project 1305 -AC94)
17
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |