Click here to make tpub.com your Home Page

Page Title: Requirements
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-81313 (WP)
Cradle,  Universal,
Large,
List of Drawings 620939
MHU-65/E
Frame  S t a c k i n g ,
Small,
List of Drawings 620942
MHU-64/E
Frame,  S t a c k i n g ,
Large,
List of Drawings 620943
MHU-66/E
(And all documents listed thereon.)
(Copies of specifications, standards, and drawings required
by  suppliers  in  connection  with  specific  procurement  functions
should be obtained from the procuring activity or as directed
by the contracting officer. )
REQUIREMENTS
3.
C o n s t r u c t i o n .  - The Cradles and Stacking
3.1
Frames shall,  a s a p p l i c a b l e , be manufactured in strict accordance
with the following Bureau of Naval Weapons Lists of Drawings and
all documents listed thereon:
Cradles
LD 620935
MHU-61/E
LD 620936
MHU-62/E
LD 620938
MHU-63/E
LD 620939
MHU-65/E
S t a c k i n g Frames
LD 620942
MHU-64/E
LD 620943
MHU-66/E
3.1.2
Preproduction sample. - Unless otherwise
specified in the contract or order , preproduction samples shall
be manufactured using the methods and procedures proposed for
The samples will be tested as specified in Section 4
production.
herein and is for the purpose of determining that, prior to
starting  production, the contractors production methods are
capable of yielding items that comply with the technical
requirements of the contract.
3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business