Click here to make tpub.com your Home Page

Page Title: Requirements
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-81952B(AS)
3.
REQUIREMENTS
3.1 Materials, parts, and processes.  Not applicable.  Unless otherwise
specified herein, materials, parts and processes shall be in accordance with
MIL-R-16743.
3.2 Design and construction.
Applicable.
3.2.1 Design features.  Not applicable.  Unless otherwise specified herein,
design features shall be in accordance with MIL-R-16743.
3.2.1.1 Method of operation,
Applicable.
3.2.1.2 Commercial test equipment.
Applicable.
3.2. 1.2.1 Other commercial components.
Applicable.
3.2.1.3 Circuit grounds.
Applicable.
3.2.1.4 Interchangeability,
Applicable,
3.2.1.5 Identification of product.
Applicable.
3.2.1.6 Human factors.
Applicable.
3.2.1.7 Test set generated acoustic noise.
Applicable.
3.2.1.8 Forced-liquid cooling.  The LC shall supply cooling fluid to the
test stations and weapon replaceable assemblies (WRAs) listed in Table I at
the required operating temperature, pressure, and listed flow rate.
3.2.1.9 Space and weight limitations.  The cabinet assembly shall not
exceed 36 inches by 30 inches by 72 inches.  The remote control panel shall
not exceed 8 inches by 4 inches by 8 inches.  The weight shall not exceed
1500 pounds.
3.2.1.10 Connectors.
Applicable.
3.2.1.11 Secondary electrical power.
Not applicable.
The LC shall provide the interfaces specified below.
3.2.1.12 Interface.
3.2. 1.12.1 Test station interfaces.  The LC shall interface with Test
Station, Radio Frequency OJ-213( )/AWM-23(V), Test Station, Low Frequency
OJ-215( )/AWM-23(V) and OJ-379( )/AWM-23(V) and Stand, Fill-Drain, Coolant
System MT-4730( )/AWM-23(V) through two utility coolant lines (supply and
return).
3.2. 1.12.2 Potable water interface.  The LC shall interface with the
potable water through two utility water lines (supply and return).
3.2.1. 12.3 Electrical power interface.  The LC shall interface with the
electrical power specified in 3.2.2.1 through utility power lines.
-3-

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business