Click here to make tpub.com your Home Page

Page Title: Quality Assurance Provisions
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-81952B(AS)
3.6.6 Elapsed time meter.  An elapsed time meter, conforming to
MIL-M-7793, shall be provided.  The meter shall be readily visible during
--
operation of the LC and shall be capable of registering 9,999 hours.
The nitrogen tank shall consist of a cylinder
3.6.7 Nitrogen tank.
and shut off valve.
4.
QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection. Applicable.
4.2 General.
Applicable,
4.2.1 Classification,
Applicable.
4.2.2 Individual items.
Applicable.
4.2.2.1 Vendor's facility,  Tests performed in accordance with Table
III may be accomplished at the vendor's facility.  Evidence of satisfactory
completion shall consist of acceptance plan data sheets containing evi-
dence of compliance of operation to the expected values.
Applicable.
4.2.3
In-process inspection.
Applicable.
4.2.4
In-process data.
Table III shall apply.
4.2.5
Applicable.
Acceptance test plan.
4.2.6
Test results.
Applicable.
4.2.7
Acceptance,
Applicable.
4.2.8
Utilities.
Applicable.
4.2.9
Applicable.
Configuration.
4.3 Tests.
4.3.1 Electrical and electronic items - operational run-in test.
Applicable.
4.3.2 Mechanical items.
Applicable.
4.4 Environmental test conditions.
Applicable.
4.5 Test location.
Applicable.
4.6 Acceptance schedule.
Applicable.
4.7 Test procedures.
Applicable.
4.8 Rejection and retest.
Applicable.
-10-

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business