|
| MIL-D-18641F(SH)
bb. Hydrostatic pressure required (see 4.3.1)
u. If for submarine service, submergence test pressure (observe security requirements
(see 4.3.1.1)
dd. Shock resistance level (see 4.4.1)
ee. Selection of applicable levels of preservation and packing (see 5.1 and 5.2)
ff. When packing shall be in unsheathed crates (see 5.21)
gg. Special marking required (see 5.3).
63 Consideration of data requirements. The following data requirements should be considered
when this specification is applied on a contract. The applicable Data Item Descriptions (DIDs)
should be reviewed in conjunction with the specific acquisition to ensure that only essential data
are required/provided and that the DIDs are tailored to reflect the requirements of the specific
acquisition. To ensure correct contractual application of the data requirements, a Contract Data
Requirements List (DD Form 1423) must be prepared to obtain the data, except where DOD
FAR Supplement 27.475-1 exempts the requirement for a DD Form 1423.
Suggested Tailoring
DID Number
DID Title
Reference Paragraph
Failure mode, effects,
3.6
DI-R-7085
and criticality analysis
report
Maintainability
3.7
DI-MNTY-80144
demonstration report
Engineering drawings
Level 3
DI-DRPR-80651
3.14 and
appendix A
3.14.28.1.1,
Technical information
DI-MISC-80652
3.14.28.1.1.4.1,
reports
and appendix C
4.5
Report, vibration testing
UDI-T-23762
4.6
Equipment airborne sound
DI-HFAC-80272
measurement test report
55
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |