Click here to make tpub.com your Home Page

Page Title: Applicable Documents
Back | Up

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-D-18641F(SH)
APPENDIX C
TECHNICAL REPORT TECHNICAL CONTENT REQUIREMENTS
10. SCOPE
10.1 Scope. This appendix covers the technical content requirements that shall be included
in technical reports when required by the contract or order. This appendix is mandatory only when
data item description DI-MISC-80652 is cited on the DD Form 1423.
.
20. APPLICABLE DOCUMENTS
This section is not applicable to this appendix.
30. DESIGN REPORT
30.1 Design report content. When required by the contract or order, design report content
for applications for which cyclic life requirements are established, shall contain an analysis
demonstrating the adequacy of the design. For heat exchangers designed for submergence pressure,
a design report shall be included. The report shall be in a format to facilitate an independent
review of its content. lt is, therefore, imperative that it be simple to follow, free from ambiguity,
and should contain the following as a minimum:
Description of design requirements such as steady state transient pressures,
a.
temperatures, and external loading
b.
Regions of the component analyzed
c.
Materials used and their mechanical properties
d.
General description of the methods of analysis and assumptions
e.
All reference sources shall be listed.
f.
All computer programs shall be properly identified and described.
Report contains copies of the computer printouts (input and output).
g.
h.
Stresses shall be tabulated for each area of investigation and compared to the allowable
stresses for all stress categories.
i.
Satisfaction of cyclic requirements including stress concentration factors used in the
cyclic analysis.
Manufacturer shall submit calculations demonstrating that the free length of tubes
j.
provided between the double tube sheets is sufficient to comply with 3.14.28.1.1.
63

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business