| MIL-D-23222A(AS)
(Cont)
3.1.9.5
government representatives to witness instrumentation calibration in
accordance with the previsions of 3.1.2. Such witnesses shall adhere
to the following minimum requirements.
Installation. - The installation of transducers
(1)
and gages, and signal conditioning and recording
systems shall be reviewed and inspected to
assure:
(a) acceptable workmanship and proper location
and mounting of all instruments and related
systems;
(b) that the signal connditioning equipment does
not have any deleterious effects on measure-
ment accuracy and data reduction
(c) that magnetic tape recorders and telemetry
equipment, if installed and intended to be
used at NAVAIRTESTCEN, has been established as
compatible with NAVAIRTESTCEN ground station equipment.
(2)
Calibrations. - Where practicable, all calibra-
tions shall be Witnessed to assure that valid
calibrations are repeatable, that the instruments
have no adverse hysteresis effects, and that
each instrument is calibrated to at least the
maximum value of the parameter expected to be
attained during the demonstration.
(3)
Acceptances. - The Test Authority's written
acceptance of the instrumentation installation
and calibrations shall be delivered to the con-
tractor and acknowledged by the contractor prior
to commencing the demonstration tests.
3.1.9.6
INSTRUMENTATION PACKAGE RECOVERY. - Provision
shall be made for pilot jettisoning and subsequent
recovery of the instrumentation records, or appropriate designed
protection shall be provided for the instrumentation installations
to withstand crash damage, in the event of loss of the helicopter.
REMOVAL OF TEST INSTRUMENTATION. - After com-
3.1.9.7
pletion of all demonstration tests specified
herein, to the satisfaction of NAVAIRTESTCEN and NAVAIR and upon
17
|