Click here to make tpub.com your Home Page

Page Title: Planning Conferences
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




MIL-D-23222A(AS)
3.1.10
(Cont)
(9) Satisfied theNAVPRO that safe egress from the
aircraft will be practicable to accomplish under
emergency flight situations.
(10) Obtained release for flight from the NAVPRO.
3.2
PLANNING CONFERENCES
3.2.1
INSTRUMENTATION CONFERENCE. - To facilitate
accomplishment of all demonstrations and in accor-
dance with the requirements of 3.1.9 the contractor shall confer
with representatives of NAVAIRTESTCEN.  The visits to NAVAIRTESTCEN
concerning any tests shall start at least 12 months prior to the
scheduled release of the first aircraft for flight to (1) provide
satisfactory lead times for procurement of instrumentation which,
at the time of the conference, may not be available as contractor-
furnished equipment (CFE) or from the SFTIP as government-ftumished
equipment (GFE), and (2) to facilitate compliance with other pro-
visions of this specification.
3.2.2
CRUISE CONTROL TEStS PLANNING CONFERENCE.  A
preliminary conference shall be held at least
4 months prior to the fuel consumption tests. The contractor shall
confer with NAVAIRTESTCEN to review preliminary test data already
available, to establish the test methods, and to establish the data
presentation format and data reduction procedures to be used in
preparing the final flight performance data. Additional conferences
between the contractor and NAVAIRTESTCEN shall be held as necessary
to resolve problems as they arise during  the flight test program.
NAVAIR (AIR-5363) shall be advised prior to each conference.
PRE-NAVY PRELIMINARY EVALUATION CONFERENCE. -
3.2.3
Not later than one week prior to the expected
start of each phase of the evaluation, a CONference shall be called by
NAVAIR at NAVAIRTESTCEN of representatives of the contractor, NAVPRO,
NAVAIR, and NAVAIRTESTCEN.  The conference is to review the results of
all flight tests accomplished prior to that phase of the evaluation, and
to review the extent to which pre-evaluation requirements have been com-
pleted, including the required operating flight envelopes. The contractor
shall define the configuration of' the helicopter to be utilized during the
evaluation phase.
POST-NAVY PRELIMINARY EVALUATION CONFERENCE. -
3.2.4
Following receipt of the final NAVAIRTESTCEN
Report of each phase of the evaluation a conference shall be called by
NAVAIR at NAVAIR of representatives of the contractor, NAVPRO, NAVAIR-
TESTCEN and NAVAIR. The conference is to establish disposition of
corrective action and contractor or government responsibility of each
deficiency reported by the evaluation team. Recommended Corrective
action and possible alternatives along with schedules and product ion
effectivity shall be provided by the contractor for each reported de-
ficiency to facilitate review by NAVAIR for the purpose of determining which
of the deficiencies must be corrected by the contractor prior to comencing
the next evaluation phase.
19

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business