|
| MIL-D-23222A(AS)
(Cont)
3.14.1.4
(4) The mechanical operation of rotatable and other
antennas having roving parts, and antennas with
other controllable features, provides satisfactory
operation and coverage.
NAVIGATION EQUIPMENT. - The contractor shall
3.14.1.5
demonstrate that the installation and performance
of the navigation equipment conform with applicable test specifica-
tions listed in the detail specification. The contractor shall
further demonstrate satisfactory performance of the navigation equip-
ment within the accuracies required by the mission of the helicopter,
as well as satisfactory system integration, overall compatibility
and indicator display under operational conditions. The accessi-
bility of the navigational equipments for maintenance and field
testing, as well as satisfactory maintenance techniques including
"go" and "no go" type preflight performance checking, shall also
be demonstrated.
IDENTIFICATION EQUIPMENT. - The contractor shall
3.14.1.6
demonstrate that the operation of the identifi-
cation equipment, including transponders, interrogator-responsors,
coders, and decoders meets the requirements of the applicable speci-
fications, and, that within the designed mission of the helicopter,
the operation is satisfactory.
COMMUNICATIONS EQUIPMENT. - The contractor shall
3.14.1.7
demonstrate that the installation and the per-
formance of the communications equipment in accordance with
applicable specifications. The contractor shall further demonstrate
that the installed communication equipment and its performance are
adequate for the accomplishment of the design missions of the heli-
copter, Accessibility of the communication controls for operation
and readout, and the accessibility of the communications equipment
for maintenance and field testing, as well as satisfactory maintenance
technique including pre-flight "go" and "no go" performance testing,
shall also be demonstrated.
RADAR AND INFRARED EQUIPMENTS. - The contractor
3.14.1.8
shall demonstrate that the operation of all radar
and/or infrared equipment is in accordance with applicable specifi-
cat ions. All radiation tests shall be conducted at properly instru-
mented facilities for control of position and flight path, in
addition to electrical measurements. The contractor shall include,
87
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |