|
| MIL-D-23222A(AS)
(Cont)
3.19.2.8
account for the gain due to ground-reflected signal.
The manner in which the isotropic level is deter-
mined shall be described in the report.
3.19.2.9
MOVING PICTURE COVERAGE REPORT. - When significant
events occur during the roving picture coverage,
the film shall be processed and forwarded with complete flight data
concerning the significant events to NAVAIR as soon as practicable.
3.19.2.10
POWER PLANT VIBRATION SURVEY REPORT. - See
3.3.5.2.5.1
3.19.2.11
COMPRESSOR INLET AND TURBINE OUTLET SURVEY REPORT. -
See 3.3.5.2.5.3.
3.3.9.2.12
ELECTRICAL SYSTEM DEMONSTRATION DATA REPORT. - Sub-
mit for acceptance. This report shall be submit-ted
as soon as practicable but not later than 60 days prior to release of
the helicopter for INSURV electrical and electronic trials. Data my
be obtained during the Navy Preliminary Evaluations of 3.3. The report
shall include the following:
(1) up-to-date Copies of all electrical wiring diagrams
showing cable designations and lengths.
(2)
A description of the electrical system operation
during normal, emergency, and ditching procedures.
(3)
An electrical load analysis (AC and CD) compiled in
accordance with Spec MIL-E-007016B(Aer). A description
of the instrumentation and procedures used in con-
ducting the analysis and measurements.
(4)
Data, methods, and instrumentation pertaining to -the
contractor's flight and ground evaluations of the
capabilities of the electrical system as pre-
scribed in a subparagraphs under 3.13. These reports
shall contain comprehensive discussion of the results
obtained and emphasize any operational limitations
imposed by the system design. Any contractor re-
quest for a waiver of the applicable specifications
Or portions thereof shall be referenced and supported
by the discussions contained in these reports. The
discussion and data shall be sufficient to judge
the validity of the conclusions reached by the
contractor.
109
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |