Click here to make tpub.com your Home Page

Page Title: Table 1. Test schedule.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-D-52923B(ME)
c. Inspection comparison (see 4.5).
d. Toxicological data and formulations inspection (see 4.6).
e. Inspection of packaging (see 4.7).
4.3 First article inspection.
4.3.1 Examination. Each distributor shall be examined as specified in 4.5.1. Presence of one
or more defects shall be cause for rejection.
4.3.2 Tests. Tests marked by "X" in column I of table I shall be performed. Failure of any
test shall be cause for rejection.
4.4 Quality conformance inspection. Each vehicle, without payload and with lighting system
on, shall be operating for a distance of not less than fifteen miles. After the fifteen mile run, the
vehicle shall be examined for the defects specified in 4.5.1. Each vehicle, completely assembled,
adjusted, and serviced, shall then be subjected to the tests marked by an X in column 2 of table I.
TABLE I. Test schedule.
First
Quality
Requirement
Test
article
conformance
Test
Paragraph
paragraph
1
2
3
4
5
X
X
Production run-in.1/
3.9.4
4.5.2.1
X
Travel.
3.4.2
4.5.2.2
X
Axle and suspension
X
3.8.3, 3.8.3.1,
4.5.2.3
check.
3.8.3.3
X
Air brake system.
X
3.8.5, 3.8.6
4.5.2.4
X
Electrical system check.
X
3.8.7 thru 3.8.9
4.5.2.5
X
Fording check.
3.4.6
4.5.2.6
X
Stability check.
3.4.5
4.5.2.7
X
Slinging provisions.
3.10
4.5.2.8
X
Tiedown provisions.
3.11
4.5.2.9
X
Vehicle weight.
3.4.3
4.5.2.10
X
X
Pumping system operation.
3.4.2
4.5.2.11
X
Pump performance test.
3.7.1
4.5.2.12
X
Pump operation test.
3.7.1
4.5.2.13
X
Tracking tolerance, jack-
3.4.2
4.5.2.14
knife, and landing leg test.
X
Sound level measurement.
3.21
4.5.2.15
X
Spray distribution rate test.
3.7.4
4.5.2.16
X
Spraying mode test
3.7.5
4.5.2.17
X
Compatibility check.
3.4.2
4.5.2.18
1/
The production run-in test shall be conducted before any other test.
17

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business