|
| ![]() MIL-D-52987A(ME)
TABLE I. Examination schedule. Cont'd
First
Requirement
Article
Production
Defect
Paragraph
1
2
3
4
X
X
130.
Shipping data plates not as specified.
3.22
X
X
131.
Treatment and painting not as specified.
3.23
X
X
132.
Camouflage pattern data not provided as specified.
3.23.1
X
X
133.
Stenciling instructions not furnished.
3.24
X
X
134.
Lubrication not as specified.
3.25
X
X
135.
DAP mounting bracket not as specified or not
3.26
installed as specified.
X
X
136.
Special tools not furnished.
3.27
X
X
137.
Toolbox not furnished.
3.28
X
X
138.
Workmanship not as specified.
3.30 thru
3.30.3
X
X
139.
Parts or components missing.
Sec. 3
X
X
140.
Assembly incomplete or incorrect.
Sec. 3
X
X
141.
Cracked or broken parts or assemblies.
Sec. 3
X
X
142.
Permanent deformation of any part or assembly.
Sec. 3
X
X
143.
Leaks in coolant, fuel, oil lines, or cylinders.
Sec. 3
4.5.2 Tests. Tests shall be conducted in accordance with table II. Prior conducting any operational
tests, all STE/ICE-R diagnostic tests specified in 3.16.7 shall be measured and recorded.
TABLE II. Demonstration schedule.
First
Test
Requirement
Article
Production
Test
Paragraph
Paragraph
1
2
3
4
5
Type I
Type II
Section 3
4.5.2.1
X
Production run-in
X
X
3.6.1
4.5.2.2
-
Noise level
X
X
3.2, 3.8
4.5.2.3
Sectionalization
-
-
X
3.6.2
ROPS/FOPS
4.5.2.4
-
X
X
3.7.1
Weight
4.5.2.5
-
X
X
3.2, 3.9,
4.5.2.6
Performance
X
-
X
3.12 thru
3.15
3.9.1
4.5.2.7
-
Travel
X
X
3.9.2
Braking
4.5.2.8
-
X
X
Stability
4.5.2.9
3.9.3
X
-
X
22
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |