Click here to make tpub.com your Home Page

Page Title: Box, Packing Ammunition for Delay Element M5 or M8 in Metal Container, M21, Drawing 8826729
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




MIL-D-60572B
Critical
None defined
Major
None defined
Minor
201
Contents loose
Manual/Visual
202
Separator or filler missing
Visual
203
Sealing inadequate, incompetent, or incorrect
Visual
204
Container cut or damaged
Visual
205
Marking missing, incorrect, or illegible
Visual
4.6.7 Box, Packing Ammunition for Delay Element M5 or M8 in Metal Container, M21, Drawing
8826729.
Critical
None defined
Major
None defined
Minor
201
Contents loose
Manual/Visual
202
Hardware missing, loose, broken, or improperly engaged
Visual
203
Strapping missing, loose, broken, or improperly assembled
Visual
204
Contents of box exposed
Visual
205
Box damaged
Visual
206
Marking missing, incorrect, or illegible
Visual
207
Number of cartons incorrect
Visual
4.7 Test methods and procedures.
4.7.1 Ignition device x-ray. Prior to assembly into the cartridge, the ignition device shall be radiographically
examined in accordance with MIL-STD-453. Each ignition device shall be x-rayed on boards or trays with the
cup side perpendicular to the rays. The x-ray negatives shall be identified by item nomenclature and by lot
number. Ingition devices are to be left mounted to the boards or trays until after the x-rays have been reviewed
and defects identified to facilitate removal of defective units. After screening, the x-ray negatives with
defectives identified shall be forwarded to the engineering activity designated by the procuring activity (see
6.2). Interpretation of the radiographic films shall verify the following:
Presence of Styphnate Composition
No Material Defects
4.7.2 Protective finish. Unless otherwise specified (see 6.2), sampling plans and procedures in the
determination of acceptability of coated parts submitted by the contractor shall be in accordance with the
contract and MIL-A-8625. The anodized part shall be sectioned longitudinally to better expose the critical
surfaces to salt spray test.
10

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business