6.3 First article. When a first article inspection is required, the contracting officer should provide specific
guidance to offerors whether the items should be a first article sample or a sample selected from the first
production items (see 3.1), and the number of items to be tested as specified in 4.4. The contracting officer
should also include specific instructions in acquisition documents regarding arrangements for examination,
approval of first article test results, and disposition of first articles. Invitations for bids should provide that
the Government reserves the right to waive the requirement for samples for first article inspection to those
bidders offering a product which has been previously acquired or tested by the Government, and that bidders
offering such products, who wish to rely on such production or test, must furnish evidence with the bid that
prior Government approval is presently appropriate for the pending contract. Bidders should not submit
alternate bids unless specifically requested to do so in the solicitation.
6.4 Hazard notice. The cartridge described herein and certain of its components are flammable or
explosive and present hazards in manufacture, handling, storage, and shipment. The contractor should
recognize these properties and take appropriate measures to guard and protect against fire, explosion, adverse
environment, corrosive atmosphere, rough handling, and electrically induced incidents.
6.5 Definition.
6.5.1 Ignition delay time. Ignition delay time is the time from primer impact to the start of pressure rise.
6.6 Manufacture as a component. When the delay element is being manufactured in conjunction with
a delay cartridge as a component thereof, the first article requirements for ballistic, vibration, x-ray, and
packaging requirements are waived, and the requirements of the cartridge specification shall apply.
6.7 Subject term (keyword) listing.
Ejection systems, aircrew
Emergency escape systems, aircrew
Escape systems, aircrew
Life-saving systems, aircrew
6.8 Changes from previous issue. Marginal notations are not used to identify changes with respect to the
previous issue because of the extensiveness of the changes.
Custodian:
Preparing activity
Navy-OS
Navy-OS
Air Force-99
(Project 1377-0D77)
Review activity:
Air-Force 70
20

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business