|
| MIL-D-63199A(AR)
4.4.3 Testinq.
Testing is described in the Quality Conformance
Inspection Tables.
4.4.3.1 Air leak test. Major defect - This test shall be
performed 100% and as specified in 4.5.1 using equipment in
accordance with 4.4.4. Any drum which fails the test shall be
classified defective and removed from the lot.
4.4.4 Inspection equipment. The inspection equipment required
to perform the examinations and tests prescribed herein is described
in the paragraph Reference/Inspection Method column in the tables
starting with Paragraph 4.4.2.1. The contractor shall submit for
approval inspection equipment designs in accordance with the terms
of the contract. See Section 6 of MIL-A-48078 and 6.3 herein.
4.5 Methods of inspection.
4.5.1 Electronic testinq of repair parts. (See Test Procedure
Dwg. 9280390).
4.5.2 Air leakaqe test.
The drums shall be tested using the
procedures on Dwg. 8806652.
5.
PACKAGING
5.1 Packaginq requirements.
Packaging shall be as specified on
the drawings below:
Nomenclature
Pkq Dwgs
Knob
11829051
Printed Wiring Board Assy,
Interconnect
9324654
Printed Wiring Board Assy,
Power Supply #1
9324648
Printer Wiring Board Assy
Power Supply #2
9324649
Printed Wiring Board Assy,
Flare Detector
9324650
Module Assembly, Programmer, Chaff
9324636
Payload Module Assembly
9321254
Flag Assembly, Safety
9322182
Cable Assembly
9324644
Breech Assembly
9324657
Sensor Assembly, Flare
9324671
Spring, Ground
9324664
Printed Wiring Board Assy,
Sequencer Switch
9324666
Plate Assembly, Sequencer
9324670
Plate Assembly, Retainer
9322166
52
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |