Click here to make tpub.com your Home Page

Page Title: Submission of results of contractor-conducted examinations and tests
Back | Up

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-D-70484(AR)
6.2.2 Contract data requirements.  Contract data requirements
for inspection equipment design shall conform to Data Item
Description DI-R-1714, Tailored.
6.3 Submission for inspection equipment design approval. See
MIL-W-63150.  Equipment designs shall be submitted as required
to:  Commander, AMCCOM, ATTN:  AMSMC-QAF-I(D), Dover, NJ
07801-5001.  Letter of submittal shall state contractor, contract
number, specification number, item nomenclature, and
classification of defects and test paragraphs .
6.4 Submission of results of contractor-conducted examinations
and tests.  Unless otherwise specified by the Contracting Officer,
the contractor shall forward requested records of examinations or
tests to:  Commander, AMCCOM, ATTN:  AMSMC-QAF-S(D), Dover, NJ
07801-5001.
6.5 Drawings.  Drawings listed in Section 2 of this
specification,  under the heading US Army Armament Research and
Development Center (ARDC), may also include drawings prepared by
and identified as US Army Armament Research and Development
Command (ARRADCOM), Rock Island Arsenal or Picatinny Arsenal.
Technical data originally prepared by these activities is now
under the cognizance of ARDC.
Preparing activity:
Custodian:
Army-AR
Army-AR
(Project 1310-A347)
25

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business