| MIL-F-27656C(USAF)
c.
4.6.3
Pressure drop test
d.
Differential pressure indicator
operation test
4.6.4
e. Extreme temperature operation test
4.6.5
4.6.9
f.
Burst pressure test
Elements
Element No 1
Paragraph
a.
Examination of product
4.6.1
b.
Bubble test
4.6.6.1
c.
Degree of filtration test
4.6.6.2
d
Pressure impulse tests
4.6.7
e.
Bubble test
4.6.6.1
f.
Flow fatigue test
Bubble test
4.6.6.1
g.
Element No. 2
a.
Examination of product
4.6.1
b.
4.6.6.1
Bubble test
c.
Pressure buildup and collapse
4.6.6.4
(test dust)
d.
Bubble test
4.6.6.1
Element No. 3
a.
Examination of product
4.6.1
b.
Bubble test
4.6.6.1
c.
Largest particle passed test
4.6.6.3
d.
Bubble test
4.6.6.1