Click here to make tpub.com your Home Page

Page Title: Failure data
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-F-2980E
4.5.3 Testing.
*
4.5.3.1 Failure data.  Unless otherwise specified herein, all tests
shall be conducted on a complete firing attachment. If test requirements
cited herein are not met, acceptance of the firing attachment shall be
deferred and the contractor shall accomplish as applicable, the following
actions:
Conduct a failure analysis study performing a dimensional,
a.
physical and visual examination of the components which are
suspected to be the cause of failure or malfunction.
b.
Evaluate and correct the applicable production processes
and procedures to prevent recurrence of the same defect(s)
in future production.
c.
Examine firing attachments, partially assembled firing
attachments, and components (including components and
subassemblies at in-process or final assembly) to insure
that material containing the same defect is purged from
the inventory and not presented to the Government for
acceptance.
d.
Submit the results of the failure analysis and the
corrective actions taken to the Government for review and
approval prior to submitting a reconditioned lot or
reconditioned subsystem for retest.
4.5.3.2 Functioning testing.  Samples of blank firing attachments
shall be taken from each inspection lot in accordance with MIL-STD-105,
Level II, using an AQL of 0.65, and shall be tested for functioning
(see 3.3.1) using the test methods specified in 4.6.
*
4.5.3.3 Certification.  Unless otherwise specified, the contractor
shall be responsible for testing necessary to accomplish certification.
For each inspection lot, the contractor shall provide the Government
representative with Certification of Compliance with applicable drawings
and specifications.
*
4.5.3.4 Packaging examination and testing.  Unless otherwise speci-
fied (see 6.2), the packaging examination and testing shall be in accor-
dance with MIL-P-14232.
4.5.4 Inspection equipment.
4.5.4.1 Acquisition, maintenance and disposition. Unless otherwise
specified (see 6.2), responsibility for acquisition, maintenance and dis-
position of acceptance inspection and test equipment prescribed on Inspec-
tion Equipment List IEL8412139, IEL7162790, IEL12002981 and IEL12002900
as applicable, and for all other inspection equipment required to perform
inspection prescribed by applicable specifications shall be in accordance
with MIL-I-45607.
6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business