| MIL-F-48067 (MU)
DRAWINGS
ORDNANCE CORPS
9268198 - Fuze, Rocket: Point Detonating, SQ and Delay, M440
PuBLICATIONS
ORDNANCE CORPS
ET-9268198 - Equipment
Tabulation
(Copies of specifications, standards, drawings and publications required
by suppliers in connection with specific procurement functions should be
obtained from the procuring activity or as directed by the Contracting
Officer.)
REQUIREMENTS
3.
3 . 1 M a t e r i a l . - Materials shall be in accordance with applicable
drawings and specifications.
3.2 F u z e A s s e m b l y . - The loaded fuze assembly shall comply with the
requirements specified on Drawing (dwg.) 9268198 and with all requirements
specified in applicable specifications.
3 . 3 B o o s t e r a n d B o o s t e r L e a d P e l l e t s . - The RDX and Explosive Compo-
sition
A5
pellets
shall
meet
the
requirements
of
MIL-P-45486
with
the
ex-
ception that the composition of the Explosive Composition A5 shall be in
accordance with MIL-E-14970.
3.4, B o o s t e r F u n c t i o n i n g . - The complete Fuze (including live booster
assembly) when armed and f u n c t i o n e d s h a l l d e t o n a t e h i g h o r d e r .
3 . 5 B a l l i s t i c F i r i n g . - The complete fuze (with live booster assembly)
shall detonate after penetrating a bunker type target.
3.6 W o r k m a n s h i p . - T h e l o a d i n g a n d a s s e m b l y o p e r a t i o n s s h a l l b e p e r -
formed in a thorough, workmanlike manner consistent with the best practices
of the industry. All parts and assemblies shall be free of dirt, grease,
The cleaning method used shall
corrosion products and other foreign matter.
not be injurious to any part nor shall the parts be contaminated by the
Surface coatings snail be continuous except for a few
cleaning agent.
All required markings shall
slight scratches not exposing base material.
be neat and sharply defined.
2
|