4.6 Performance tests. Each Test Set submitted..for acceptance
shall be subjected to the following tests to determine the
functional capabilities. All tests shall be performed with the W2
and W5 cable assemblies connected and measurements made at the
designated Test Set TEST POINTS or via the TEST RESULTS display as
herein specified. Test Set power supply has been verified through
the performance of calibration procedure Appendix A.
4.6.1 Cable assembly continuity tests. Continuity in the five
cable assemblies furnished with each FCC-FTS shall be verified per
the applicable wiring document.
4.6.2 FCC-FTS test Po intso Verify electrical continuity
between points listed in Table IV using DVM set to K ohms. Record
results in data sheets.