MIL-F-55032A(MI)
contractor shall comply with, and use these designs accordingly. The
contractor may, however, in connection with non-mandatory designs, and
with the approval of the Government, design alternate inspection equipment
or use comparable commercial equipment to facilitate his operations.
Such contractor prepared designs or commercial equipment selections must
be approved by the government prior to fabrication or procuring of the
equipment. Designs shall be submitted for approval as specified in
6.3.5.
6.3.4 Contractor designs.  Contractor designs are designs of
inspection equipment for which the Government has assigned design
responsibility to the contractor. Contractor designs shall be supported
by detailed drawings which depict all information necessary to completely
fabricate, calibrate and operate an item of inspection equipment. This
requires that the necessary views, dimensions, materials, finish, notes,
operating and calibration instructions be properly depicted in accordance
with approved practices to the extent that further calculation or
clarification will not be required. Unless otherwise specified,
contractor designs may be developed on the format the contractor
normally employs in his equipment design procedure provided such
format reflects the detail and information specified above, subject
to the following controls: All submitted contractor designs shall
conform to MIL-D-1OOO, Category E, Form 2. Legibility and reproducibility
shall permit conventional marking of clearly understandable, high contrast
reproductions. Contractors shall submit one copy of final designs
as a rolled set. Designs shall be submitted for approval as specified
in 6.3.5.
*
6.3.5 Submission of contractor design. All submitted
designs shall contain a reference to the applicable five digit
Code number contained in Section 4 of this specification. Unless
otherwise specified on the EL, all designs of equipment for inspection
of defects classified as critical and major shall be submitted for
approval to the Government in accordance with the appropriate contract.
All other designs of inspection equipment shall be approved by the
inspection element of the agency administering the contract; submission
shall be as directed by the contracting officer. Partial submission
of inspection equipment designs is permissible and encouraged. However,
the Arsenal completion date for design review will be based on the date
of the final submission of designs.
*
6.4 Submission of first article samples. Instructions as to location
for the evaluation of the first article shall be obtained from the
contracting officer. All inquiries should be forwarded to the activity
designated in the contract.
33